      Only build the entire graph of system after a parse process. · 8fcc5c59
      Eric Vidal authored
      Each tool needs to be independent, which
      meant that every time a tool was called,
      it would build the entire system graph.
      This was an obvious waste of time and resources.
      
      Now, the tools build the graph based
      on the requested services, which
      drastically reduces the time needed to
      construct the necessary dependency graph.